Revista: | Brazilian journal of chemical engineering |
Base de datos: | PERIÓDICA |
Número de sistema: | 000308849 |
ISSN: | 0104-6632 |
Autores: | Alle, A1 Pinto, J.M |
Instituciones: | 1Universidade de Sao Paulo, Departamento de Engenharia Quimica, Sao Paulo. Brasil |
Año: | 2002 |
Periodo: | Mar |
Volumen: | 19 |
Número: | 1 |
Paginación: | 25-44 |
País: | Brasil |
Idioma: | Inglés |
Tipo de documento: | Artículo |
Enfoque: | Aplicado, descriptivo |
Resumen en inglés | The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994). Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb) method to optimally schedule the operation is less effective than the proposed approach |
Disciplinas: | Química |
Palabras clave: | Ingeniería química, Plantas industriales, Procesos continuos, Calendarización, Optimización integral mixta |
Keyword: | Chemistry, Chemical engineering, Industrial plants, Continuous processes, Scheduling, Mixed-integer optimization |
Texto completo: | Texto completo (Ver HTML) |