Design and operational issues of 7 full-scale MBRs for municipal wastewater treatment



Título del documento: Design and operational issues of 7 full-scale MBRs for municipal wastewater treatment
Revista: Revista Cintex
Base de datos: PERIÓDICA
Número de sistema: 000387118
ISSN: 2422-2208
Autors: 1
2
2
1
1
Institucions: 1Universidad de Girona, Instituto Catalán de Investigaciones del Agua, Girona. España
2Universidad de Girona, Instituto del Ambiente, Girona. España
Any:
Període: Ene-Jun
Volum: 20
Número: 1
Paginació: 35-51
País: Colombia
Idioma: Inglés
Tipo de documento: Artículo
Enfoque: Aplicado, descriptivo
Resumen en español Los bioreactors de membranas (BRMs) representan una tecnología emergente por el tratamiento de aguas residuales alrededor del mundo. En esta línea, siete BRMs municipales recientemente construidas, con capacidades entre 1,100 m3·día-1 to 35,000 m3·día-1(hasta 100,000 m3·día-1 en total) han sido diagnosticadas. La evaluación del diseño y operación a través de encuestas ha sido clasificada y descrita en tres categorías distintas: i) limitaciones de diseño, ii) fallos en el equipamiento y en las membranas y iii) problemas operacionales, con sus pertinentes interrelaciones entre ellos. Los dos BRMs más antiguos presentaron membranas rotas seis y siete años de operaciones, respectivamente, siendo necesario su reemplazamiento. Mientras que las espumas (foaming) han sido identificadas como mayor problema de operación en común, otros problemas como el taponamiento (clogging), la reducción del proceso de desnitrificación o el aire en las líneas de permeado han sido los que más preocupan a sus explotadores. Además, el ensuciamiento no ha sido mencionado en ninguna de las encuestas y el consumo energético identificado como la mayor limitación de dicha tecnología
Resumen en inglés Membrane bioreactors (MBRs) represent an emerging technology for the advanced secondary treatment of municipal wastewater around the world. In this line, seven municipal MBRs facilities recently built, with capacities ranging from 1,100 m3·day-1 to 35,000 m3·day-1 (up to 100,000 m3·day-1 in total) have been diagnosed. The evaluation of the design and operational issues revealed significant improvements from the oldest to the newest MBR installed. The main operational issues surveyed have been classified and described in three different categories: i) design limitations, (ii) membranes and equipment failure and (iii) operational problems, with inter-relationships between them. The two oldest MBRs showed broken membranes after six and seven years of operation, respectively, being required its replacement. While foaming has been determined as the most common operational problem, other troubles such as clogging, reduction of denitrification process efficiency or the air in the permeate line were of more concern for the practitioners. Moreover, fouling has not been mentioned by any of the practitioners and energy consumption has been determined as the main limitation of this technology
Disciplines Ingeniería
Paraules clau: Ingeniería ambiental,
Tratamiento de aguas residuales,
Biorreactores de membrana,
Parámetros de diseño,
Consumo de energía
Keyword: Engineering,
Environmental engineering,
Waste water treatment,
Membrane bioreactors,
Design parameters,
Energy consumption
Text complet: Texto completo (Ver PDF)